Maintenance Support
26.6kWp Solar PV System @ Bedok Rise – The Glades (2016)Super Admin2020-04-28T11:10:45+08:00
26.6kWp Solar PV System @ Bedok Rise – The Glades (2016)
A&A Work for infrastructure System @ NUS (2016)Super Admin2020-04-28T11:03:38+08:00
A&A Work for infrastructure System @ NUS (2016)
NTP Digital Clock @ NUS FA (2018)Super Admin2020-04-28T11:07:12+08:00
NTP Digital Clock @ NUS FA (2018)
Wireless Control System @ STCSuper Admin2020-04-21T11:53:03+08:00
Wireless Control System @ STC